Meter Entry-Service App
Within the details screen of a Work Order>Equipment card>Meter is where the Technician can enter this information. Requiring the Meter entry can be configured so Technicians must enter a number in a Work Order based on the Work Order Type or not be required to enter a meter reading. This can be set within HQ>Admin>Work Order Types. Click here to learn more.
To enter the Meter reading:
- Select the Edit icon to enter the Meter reading
- Enter the Meter reading in the Meter field & select Save. NOTE: NA can be selected if the Meter is unknown.
Overriding the previous Meter entry
When entering the time for "Meter" a Technician may see messaging that states "This field should be at least ___" because the last meter reading that was recorded for that equipment was higher than what is currently being entered.
- The Technician can adjust the number entered in the meter field to a number higher than previously entered & select Save
- Or toggle the slider to ON to the right of "Replace Meter" & select Save. This will override the previous meter entry and allow for a lesser amount of hours to be entered.